WELCOME TO STEEL RIVER QUAY

Purpose-built for the offshore wind sector, Steel River Quay is the UK’s newest heavy-duty marshalling and loadout facility, designed to handle the demands of next-generation wind energy infrastructure.

Strategically positioned. Structurally prepared. Future-focused.

What we do
  • 450m Quay Length
  • 13.6m Maintained Depth
  • Heavy Lift Pad rated at 30t/m²
  • Shore-to-ship power
  • Tidal Range up to 5.55m (MHWS)
  • Ready for Jack-Up Vessels

ABOUT THIS PROJECT

Steel River Quay is a transformative infrastructure development on the South Bank of the River Tees, built to support the growing demands of offsure wind logistics. With phase one completed in June 2024 and full operational capacity from September 2025, the site provides exceptional capabilities for storage, marshalling and heavy loadout.

Enquire now