Steel River Quay is engineered for safe and reliable access for deep-draft and heavy-lift vessels, operating 24 hours a day, 7 days a week.
SPECIFICATION
Port capabilities at a glance
Precise details that sets Steel River Quay apart from standard maritime.
Parameter |
Specification |
Details |
|---|---|---|
| Quay Length (Phase 1) | 450 Metres | Phase 2 extension of 300-585m is planned, with construction targeted for early 2026. |
| Minimum Depth Alongside | 13.60m Chart Datum (CD) | Maintained at any state of tide. |
| Berth Pocket Dimensions | 450 metres x 90 metres | The pocket extends 90 metres from the quay wall. |
| Berth Pocket Base | Rock Blanket | 2m thick rock blanket base provides a stable platform for jack-up vessels. Max Spud Leg Load: 750 kN/m². |
| Heavy Lift Pad Load | 30 tonnes/m² (30t/m²) | Designed to handle heavy Offshore Wind components. |
| Maintained Channel Depth | 9.90 metres | Includes the turning basin. |
| Bollard Pull | 125 tonnes ‘T’ Head | Bollard spacing is approximately 14.0 metres. |
| Quay Height | 8.64m Above CD | N/A |
Specification
Details
Quay Length (Phase 1)
450 Metres
Phase 2 extension of 300-585m is planned, with construction targeted for early 2026.
Minimum Depth Alongside
13.60m Chart Datum (CD)
Maintained at any state of tide.
Berth Pocket Dimensions
450 metres x 90 metres
The pocket extends 90 metres from the quay wall.
Berth Pocket Base
Rock Blanket
2m thick rock blanket base provides a stable platform for jack-up vessels. Max Spud Leg Load: 750 kN/m².
Heavy Lift Pad Load
30 tonnes/m² (30t/m²)
Designed to handle heavy Offshore Wind components.
Maintained Channel Depth
9.90 metres
Includes the turning basin.
Bollard Pull
125 tonnes ‘T’ Head
Bollard spacing is approximately 14.0 metres.
Quay Height
8.64m Above CD